Works Licence 04 of 2013 has been approved to enable the replacement of the pontoons, piles and pier at their base located in the Whitegates area of the River Medina. 

Works are scheduled to commence in early October and will be conducted using the piling barge ‘Walcon Wizard’. The project consists of the removal of the existing pier and pontoon structures and the replacement with new units. 

Technical drawings can be downloaded below.

Works Licence approved 8th October 2013.

M3111-007-Sht.1